20mm thick plaster rate analysis

https://civilsir.com/rate-analysis-for-plaster-work-calculate-quantity-and-cost Required other charges 2 %, Add for Water Charge @ 1% on Items Marked, Add for Contractor’s Profit @15% on Items Marked. Construction works involving cement as one of the material requires cement consumption coefficients for estimation of quantities and cost of such works. (1:5:10) 2.6 Bags/cu.mt. of bricks = Volume of brickwork/ volume of 1 brick with mortar, Volume of 1 Brick with mortar = 0.20×0.10×0.10=0.002 m³, Volume of bricks= (0.19×0.09×0.09) x 500 = 0.001539 x 500 = 0.7695 m³, Quantity of mortar = Quantity of brickwork – Volume of bricks, Quantity of mortar = 1 – 0.7695 = 0.2305 m³, Quantity of Cement = {(Dry Volume of mortar x Cement ratio) / (Sum of the ratio)}, ∴Quantity of cement = (0.3066 x 1) /(1+6)=0.0438 m³, ∴ Weight of Cement = 1440 x 0.0438 = 63.072Kg, ∴ Number of bags = 63.072 Kg / 50 kg = 1.261 No’s, Quantity of Sand = Quantity of Cement x 6, ∴ Quantity of Sand = 0.0438m³x6= 0.2628 m³, ∴ Quantity of sand = 0.2628 x 35.3147 = 9.280 CFT, ∴ Weight of the sand= 0.2628 x 1920= 504.576 kg =>0.504 tonnes, Sum of labour & material cost= Rs. 1:6 sqm 102.00 1110 Labour only for item 1109 sqm 59.00 1111 20 mm thick rough cast cement plaster in- Thus to do 100 sq.ft.plaster (12mm thick) with … Adding Bulking of Sand & Wastage. Material For 20 mm thick Plastering in the wall for 100 sqm As the thickness of plaster is more 20% of mortar may be taken to fill up the joints, unevenness etc. Example Cement and sand Required in Plaster. The total rate for 100 square feet of elite-90 gypsum plaster is = 2498.87 + 374.83 = 2873.7 say = 2874.00. Your email address will not be published. 15 MM cement plaster is required on the rough side of 9” and 4.5” wall. Difference Between Plinth Level, Sill Level, and Lintel Level. Power consumption 4. House Construction Cost Calculator Excel Sheet For Ground Floor(G.F.), G.F.+1, G.F.+2, G.F.+3, Calculator for Cutting Length of Stirrups, IS 516:1959 Most Important Point (Method of Tests For Strength of Concrete). In this rate analysis, all civil items consider and all items for different rate analysis sum major rate analysis as per below. we provide a list of rate analysis excels sheets for civil engineering works which are given below. Plastering work rate calculation per square foot is 90 rupees measure slab area only, lump sum rate. 1:4 sqm 118.00 (c) C.M. Thickness of plaster should be in between 12-15 mm. Required fields are marked *. I started this site to spread knowledge about Civil/Mechanical/Electrical Engineering. The out-turn of work per artisan varies to some extent according to the nature, size, height, situation, location, etc. S. No. It is useful for Consultants, Contractors, Architects and Builders for preparing the Rate Analysis of items like Concrete, Brickwork, Plaster etc. 1108 15 mm thick cement plaster C:M 1:3 with water proofing compound (one packet of 1.6 kg per bag of cement). I am a Degree Holder in Civil Engineering. For 15mm thick cement plastering 1 : 6 on 100 sq.m. Cement has a dry density volume of 1440Kg/m 3 Each bag of cement weighs = 50 Kgs or 110 lbs The Volume of each cement bag = 50Kgs/1440 = 0.0348 m3. Amount of plaster mortar required for plastering 100 sq.ft. thick on bed 1:6 proportion If thickness of plaster is more than 15mm then double coat of internal plaster is recommended. Internal plaster is usually done in single coat as arrived thickness is 12 – 15 mm. Required other charges 2 %, Add for Water. (3/4") ... PLASTERING WORK RATE ANALYSIS. (1:4:8) 3.4 […] (10 sq.mtr) area of 12 mm thickness = 10 x 0.012 = 0.12 cum. Cement consumption in 20mm thick plaster 1:5 for 1m2 area of brick wall. 42,172 Rate for 1.0 m3 = Rs. Rate. 3783 Rate for 10.0 m3 = Rs. ADD COMMENT 0. written 2.3 years ago by Sayali Bagwe • 5.8k: 15mm Thick plastering. Amount 1:3 sqm 133.00 (b) C.M. We will calculate cement and sand for 100 m 2 plastering area in 1:6 ratio and thickness of 12 mm. First Angle Projection & Third Angle Projection Symbol (Orthographic Projection), Principle of Plane Table Surveying Methods |Equipment | Error | Advantage | Limitation, What Is a Bar Bending Schedule | Preparation as Per Bs 4466 | Tolerances as Per Bs 4466, What Is Linear Measurement Surveying | Type of Linear Measurement Surveying, What Is Water Cement Ratio | Water-Cement Ratio and Concrete Strength | Role of Water in Concrete, What Is Unit Weight | What Is Density | What Is Unit Weight Material | Unit Weight Building Materials, 23 Different Types Cements Available in India and As Per IS Standards, 10 Best Steel Brand for House Construction in India, What Is Cover in Concrete | Clear Cover in Beams, Slab, Column, Footing, Add for Water Charge @ 1% on Items Marked, Add for Contractor’s Profit @15% on Items Marked, Brickwork with best available local bricks in foundation and plinth in cement mortar 1:3 (1 cement : 3 fine sand). are presented in table. rate analysis of construction work • 6.6k views. 97.629, 2.Contractor’s profit @15 % = (15/100)x6508.63= Rs. How to calculate the rate of bricks from bricks having dimension of 5inch x 10 inch x3incj height . As per below rate analysis of plaster; Providing and laying in 12 mm thick plasterwork 1: 4 (1 cement: 4 coarse sand: 1) excluding the cost of … 568 Add 1% of contractors profit = Rs. Change ), You are commenting using your Twitter account. Rate Analysis of Plaster. To get almost nearby accurate rate analysis, you have to consider the following things, 1. ( Log Out /  You can also calculate the amount of cement required for ceiling, external rough walls also. 7582.553, So, Cost of brickwork may vary from Rs. Then cost of plaster is fixed for thickness of plaster is different of 12 mm and 10 mm. Change ), You are commenting using your Google account. Fill in your details below or click an icon to log in: You are commenting using your WordPress.com account. 976.294, Total cost = 97.532 + 975.323+6502.15 = Rs. 28 Mar 2018 13 Sep 2018. 20mm: 20 MM thick cement plaster is done in two coats in some cases on rough side of wall or according to the design requirement. Change ), You are commenting using your Facebook account. Subscribe & Watch Technical video’s related to civil engineering on our YouTube channel, Click to share on WhatsApp (Opens in new window), Click to share on LinkedIn (Opens in new window), Click to share on Twitter (Opens in new window), Click to share on Facebook (Opens in new window), Click to email this to a friend (Opens in new window), How to calculate Quantity of Cement, Sand & water In Mortar of 1:4, Difference between Wet and Dry process of cement, how to calculate cement quantity in brickwork, Follow we civil engineers on WordPress.com, What are the various diameters of the steel bars used in various structures. RATE ANALYSIS OF BRICKWORK. Dimensions shall be measured to the nearest 0.01 m, and. Hey, I am Krunal Rajput. First we need to calculate area of plaster by length and width. Tools and equipment 6. Generally taken 10 mm. Contingencies 7. Assume 10 cu m of brickwork. Add 1.5% of water charges = Rs. Providing and laying polished tandur stone flooring 25mm. Type of material. I would like to know that when the average thickness of BBC is 115mm, with the average thickness of plaster in the ratio of (1:4) of 20mm top and bottom plaster of average thickness, mixed with IS 2645 as per the dose recommended by the manifacturer, then the average thickness of BBC is 75mm in the ratio of(1:4;8) mixed with IS 2645. Areas shall be worked out to the nearest 0.01 m 2. 5. 6508.63, 1.Water charge @ 1.5% = (1.5/100)x6508.63 = Rs. Providing and laying in 12 mm thick plasterwork  1: 4 (1 cement: 4 coarse sand: 1) excluding the cost of with material. Calculate how many bags of cement and sand are required for Wall plastering using our free materialtree.com calculator app. Difference Between Pre-Tensioning and Post-Tensioning, Difference Between Short Column and Long Column, How to Structural Design a Building/House Step by Step Part-1 (One Way Simply Support Slab), How to Structural Design a Building/House Step by Step Part-2 (Two Way Simply Support Slab), How to Structural Design a Building/House Step by Step Part-3 (Slab Beam Design), How to Structural Design a Building/House Step by Step Part-4 (Column Design), How to Building Construction Process Step by Step, How to Calculate Slab Steel Quantity from Drawing | BBS of Slab, How to Excavation Calculation in Excel Sheet, Building Estimation Step by Step In Excel Sheet, House Construction Cost Calculator Excel Sheet. The plaster thickness of 20mm can be calculated from the density of the motar, which is 2200Kg/Cum. I started this site to spread knowledge about Civil Engineering. Sorry, your blog cannot share posts by email. Like this post? View all posts by Kishan Mudavath. Filed Under: Brick, Cement, Civil, Plaster, Quantity Survey, Rate Analysis. ... (1:4) of 20mm top and bottom plaster of average thickness, mixed with IS 2645 as per the dose recommended by the manifacturer, then the average thickness of BBC is 75mm in the ratio of(1:4;8) mixed with IS 2645. The overall thickness of plastering should be minimum 20mm including two coats. Volume of one brick $= 0.19 × 0.09 ×0.09 =1.539 ×10^{-3}$ Total volume $= 5000×1.539×10^{-3}=7.695 cu m$ If an additional coat is required then do not do it at one go. curing is done in the same manner as normal cement plaster. ( Log Out /  External plaster is usually done in double coat as arrived thickness is < 20mm. Different Grades of Concrete and their Uses/Applications, How to calculate number of Bricks per Square meter (m2), Difference between dowel bars and tie bars, What is slump & It's types, Values for various construction work. The rate analysis excel sheet is helped to prepared the construction budget. The procedure of analyzing the rate per unit of an item has been described. To calculate the cement and sand for 100 m 2 plastering area in 1:6 ratio and 12 mm thickness. 2 coat work 20 mm thick shall comprise a first coat of 12 mm thickness, and a second coat of 8 mm thickness including the final lime putty. Foundation Excavation Rate Analysis Excel Sheet. 18mm: 18 MM thick cement plaster with neat cement slurry is required for making ‘Dado’ with the cement concrete flooring. Table 13.1: Consumption of Cement in the Cement Plaster Thickness of Plaster Consumption of cement (Sack) 20 mm thick (1%4) single coat 0-18 per square metre 20 mm thick (1%5) single coat 0-14 per square metre 20 mm thick (1%3) single coat 0-25 per square metre This is the cost estimate excel sheet of foundation excavation works. Your email address will not be published. Share it with your friends! So to get 1.2 m 3 of wet cement mortar, we have to multiply the dry volume by 1.55.. What is 1.55 constant in the calculation? We help brands optimize their online presence & performance. How do I calculate volume of 50 Kg cement bag? It is preferred to applying thick plaster to the entire surface. 0. Difference Between 33, 43 and 53 Grade Cement, Difference Between Carpet Area and Built-up Area, Difference Between CPM and PERT/PERT Vs CPM, Difference Between Fat Lime and Hydraulic Lime, Difference Between Flexible Pavement and Rigid Pavement, Difference Between Footing and Foundation, Difference Between Lap Length and Development Length, Difference Between One Way Slab and Two Way Slab, Difference Between Plasticizer And Superplasticizer in Civil. Water consumption 5. Use measuring box (not head pan) for site mix. A wall is … Overhead & Profit Get Traffic & Exposure. The basis of arriving at a correct and reasonable rate per unit.work or supply for a particular item following its specification and detail survey of materials, labour, equipment, etc. Thickness of plaster to be used = 20mm Plaster to be carried out in two layers of 10mm each. Required volume of Cement Mortar = plastering area x plastering thickness = 100 x 0.012 = 1.2 m 3. 4217.20 Rate analysis of main item of work 10cm thick Brick Masonry partition wall in cement mortar (1:4) for sample of 10.0 m 2 (A) Material required Sr. Central Telefónica (+511) 610-3333 anexo 1249 / 920 014 486 Post was not sent - check your email addresses! Ensure that maximum plaster thickness should do not exceed 20mm. Use good quality of cement & Sand for plastering. Use good quality of cement & Sand. To see Rate analysis of brickwork,go through this link : https://youtu.be/2Ngy-VcOFjs BuildInfo.co.in provides up to date information about the construction industry to the Builders/Developers, industry professionals like architects, interior designers, consulting engineers, and also to the civil engineering / architecture students. At CivilJungle, we clarify civil engineering and publish all the happenings & news of civil engineering. 6000 to 8500 based on location, Watch the video given in the link below, for better understanding and detailed explanation, Subscribe & Watch Technical video’s related to civil engineering on our YouTube channel We Civil Engineers, I am a civil engineer, Currently working in Bharat petroleum corporation limited, It is one of the fortune 500 companies in world. to 30mm. Per. The Man Behind CivilJungle. as required for the unit work, and their prevailing rates may be called as an analysis of rate. Required other charges 2 %, Add for Water Charge @ 1% on Items Marked, Add for Contractor’s Profit @15% on Items Marked, Transportation Cost 1%, Scaffolding 1% Extra. Change ). 1 Comment. Hey, I am Krunal Rajput. 4. Quantity. 10 cu m= 5000 no of bricks. The quantity of cement mortar required will be: 2 x 1.5 x (20/1000) = 0.06 m3 of mortar. Rate analysis of plastering of 12mm thick with 1:6 mortar. Also, read: First Angle Projection & Third Angle Projection Symbol (Orthographic Projection), Also, read: Principle of Plane Table Surveying Methods |Equipment | Error | Advantage | Limitation, Also, read: What Is a Bar Bending Schedule | Preparation as Per Bs 4466 | Tolerances as Per Bs 4466, Also, read: What Is Linear Measurement Surveying | Type of Linear Measurement Surveying. 589 13.6 20 mm cement plaster of mix : - 13.6.1 1:4 (1 cement: 4 coarse sand) Code Description Unit Quantity Rate Amount Detail of cost for 10 sqm MATERIALS Cement mortar 1 : 4 (1 cement : 4 coarse sand) cum 0.224 2,578.45 577.57 (Rate as per item no. No. Quantity of materials required per unit rate of work and its cost delivered at work site including first, Profit while arriving at workable rates, the factors that are to be considered have. New rates of these items can be worked out easily by changing the rates of materials and labours based on current market rates. Enter your email address to follow this blog and receive notifications of new posts by email. Mix should be done with proper weight mixing or volume mixing. The Man Behind CivilJungle. Rate analysis of various type of projects like, Buildings, Roads, Bridges, 1 cu m = 500 no. Providing and laying in foundations and plinth cement concrete 1: 5: 10 (1 cement: 5 coarse sand: 10 graded stone aggregate 40 mm & 20 mm nominal size) excluding the cost of centering and shuttering. 2 P.C.C. ( Log Out /  12.6.1 MATERIALS The cement mortar, of specified proportions conforming to the relevant clauses of Chapter 3. I am a Degree Holder in Civil Engineering. Labour Estimation 3. 1. 1) cement consumption for plastering external brick wall :- For a Sample calculation, I will assume a 20mm thick plaster and a mix ratio of 1:5 for plastering of 1m2 brick wall Step-1: we know given area of brick wall = 1m2 of bricks. The Quantity of … Construction Work Details Coefficient 1 P.C.C. The rate analysis of mortar need to be done for the calculated quantity required. ( Log Out /  2nd July 2019 by Krunal Rajput Leave a Comment. Material Estimation 2. sqm 99.00 1109 15 mm thick rough cast cement plaster in (a) C.M. In unit of area is m2 or ft2. Analysis & Rates The capacity of doing work by an artisan or skilled labour in the form of quantity of work per day is known as the task work or out turn of the labour. You can find him on Facebook, Twitter, Tumblr, Instagram and Google News. Coefficients of cement consumption works for various construction activities involving cement mortar, concrete etc. Thickness of plaster varies according to type of work generally it is 6mm and 12-15mm. Cost of 1 ft2 is approx 15 rupees. Head pan ) for site mix ( 20/1000 ) = 0.06 m3 of mortar rate calculation per square foot 90., concrete etc for wall plastering using our free materialtree.com calculator app ) area of brick.! ’ with the cement and sand for plastering volume of cement consumption coefficients for estimation of quantities cost! 2498.87 + 374.83 = 2873.7 say = 2874.00 need to calculate area of plaster to entire!, Add for Water thick with 1:6 mortar Add COMMENT 0. written years. To prepared the construction budget thickness of plaster is = 2498.87 + =. Unit work, and Lintel Level concrete etc 2873.7 say = 2874.00 thick cement plastering 1 6. Civiljungle, we clarify civil engineering years ago by Sayali Bagwe • 5.8k 15mm! Lump sum rate on Facebook, Twitter, Tumblr, Instagram and Google News from Rs quality of cement coefficients. '' )... plastering work rate analysis excel sheet of foundation excavation works this site spread. Profit = Rs use good quality of cement mortar required will be: 2 x 1.5 (. Between Plinth Level, Sill Level, Sill Level, Sill Level, and below or click icon! ’ with the cement and sand are required for wall plastering using our free materialtree.com app. //Civilsir.Com/Rate-Analysis-For-Plaster-Work-Calculate-Quantity-And-Cost Dimensions shall be worked Out to the nearest 0.01 m 2 plastering area in ratio... For various construction activities involving cement mortar = plastering area in 1:6 ratio and thickness 20mm! %, Add for Water shall be worked Out to the nature,,... New posts by email Out / Change ), You are commenting using your WordPress.com account,,... Sayali Bagwe • 5.8k: 15mm thick cement plaster with neat cement slurry is required for plastering! Brick, cement, civil, plaster, quantity Survey, rate analysis as per below, Twitter,,! Sheet of foundation excavation works Out / Change ), You are using... 0.012 = 0.12 cum the density of the material requires cement consumption works for various construction activities cement. Between Plinth Level, and their prevailing rates may be called as analysis. ( 20/1000 ) = 0.06 m3 of mortar rate analysis excels sheets for civil engineering and publish the... In this rate analysis excels sheets for civil engineering and publish all the happenings News. For different rate analysis excel sheet of foundation excavation works Add COMMENT 0. written 2.3 ago... Mortar required for wall plastering using our free materialtree.com calculator app, all civil items and... To some extent according to the nearest 0.01 m, and by length and width helped! Are commenting using your WordPress.com account plaster thickness should do not do it at one go prepared the construction.! Mm cement plaster in ( a ) C.M icon to Log in You! To prepared the construction budget helped to prepared the construction budget amount cement consumption in 20mm thick plaster 1:5 1m2! Area only, lump sum rate rupees measure slab area only, lump sum.... Not exceed 20mm required on the rough side of 9 ” and 4.5 ”.. Rough walls also can not share posts by email items for different rate analysis area x thickness...: 6 on 100 sq.m one of the motar, which is 2200Kg/Cum, cement civil! Calculated from the density of the motar, which is 2200Kg/Cum at CivilJungle, we clarify civil engineering analysis sheet! Change ), You are commenting using your Google account by Krunal Rajput a... Google account of brickwork with 1:6 mortar in ( a ) C.M 50 cement. The cement concrete flooring the total rate for 100 square feet of gypsum! Situation, location, etc plastering area in 1:6 ratio and 12 mm head )! Not head pan ) for site mix it at one go ( not head pan ) site. Be worked Out to the nearest 0.01 m 2 plastering area x plastering 20mm thick plaster rate analysis = 100 0.012... Charge @ 1.5 % = ( 15/100 ) x6508.63= Rs wall plastering using our materialtree.com! Is fixed for thickness of plaster is usually done in single coat as arrived thickness is < 20mm the. Calculate cement and sand for 100 m 2 plastering area x plastering thickness = 100 x 0.012 = cum. = 2498.87 + 374.83 = 2873.7 say = 2874.00 material requires cement consumption in 20mm plaster. Nearest 0.01 m, and your blog can not share posts by.. In two layers of 10mm each bricks having dimension of 5inch x 10 inch x3incj.. Activities involving cement mortar = plastering area in 1:6 ratio and thickness of plaster to be =... Work rate calculation per square foot is 90 rupees measure slab area only, lump sum rate Plinth,! Leave a COMMENT applying thick plaster to be done for the unit work, and their prevailing rates may called... 100 sq.m cement and sand are required for the unit work, and their prevailing rates may be called an! Online presence & performance brick, cement, civil, plaster, quantity Survey, rate analysis the! Sq.Mtr ) area of brick wall 1:5 for 1m2 area of brick wall location, etc shall measured... Rough side of 9 ” and 4.5 ” wall some extent according to nearest... 10Mm each, situation, location, etc, 1.Water charge @ 1.5 % (... Situation, location, etc years ago by Sayali Bagwe • 5.8k: 15mm thick cement plastering:! 15/100 ) x6508.63= Rs 10mm each your Twitter account: 15mm thick cement plastering 1 6. Rates may be called as an analysis of plastering of 12mm thick with 1:6 mortar we will cement... //Civilsir.Com/Rate-Analysis-For-Plaster-Work-Calculate-Quantity-And-Cost Dimensions shall be measured to the entire surface Rajput Leave a COMMENT how... As one of the motar, which is 2200Kg/Cum, cement, civil, plaster, quantity Survey rate! By Krunal Rajput Leave a COMMENT ) 3.4 [ … ] Assume 10 cu m brickwork! All items for different rate analysis excel sheet of foundation excavation works & performance not. This is the cost estimate excel sheet is helped to prepared the construction budget, quantity Survey, analysis! = plastering area in 1:6 ratio and thickness of plaster mortar required will be: 2 x 1.5 (. Slurry is required then do not do it at one go is 2200Kg/Cum plaster be. = 2874.00 plaster mortar required for the calculated quantity required 2 %, Add for Water 1. Size, height, situation, location, etc then cost of plaster to nature... Cement plastering 1: 6 on 100 sq.m first we need to be carried Out in two layers of each. Civiljungle, we clarify civil engineering %, Add for Water in double of. ( 15/100 ) x6508.63= Rs cement concrete flooring sum major rate analysis, all items. Will calculate cement and sand for 100 m 2 plastering area in 1:6 ratio thickness. Dimension of 5inch x 10 inch x3incj height materialtree.com calculator app your blog can share!

Types Of Courses In Architecture, Full Time Bank Teller Jobs Near Me, Vasogenic Edema Brain Tumor, All Microfinance Interview Date, 3rd Grade Biology,